Balance or Blackout?

Por: Analíticas: Mostrar analíticasTipo de contenido:
  • texto
Tipo de medio:
  • sin mediación
Tipo de soporte:
  • volumen
Tema(s):
Contenidos:
If an industrial facility's internal power plant fails, non-essential systems can be switched off in order to reestablish balance in the network. A new Siemens automatic load-shedding system reacts at lightning speed to prevent any instability in such situations
En: Pictures of the future (nro. , Spring 2013), p. 54-55S.T.:H001 PIC PP3726
Valoración
    Valoración media: 0.0 (0 votos)
No hay ítems correspondientes a este registro

If an industrial facility's internal power plant fails, non-essential systems can be switched off in order to reestablish balance in the network. A new Siemens automatic load-shedding system reacts at lightning speed to prevent any instability in such situations

No hay comentarios en este titulo.

para colocar un comentario.