Balance or Blackout?
Muller, Bernd
Balance or Blackout?
If an industrial facility's internal power plant fails, non-essential systems can be switched off in order to reestablish balance in the network. A new Siemens automatic load-shedding system reacts at lightning speed to prevent any instability in such situations
MAXIMIZING EFFICIENCY
AUTOMATIC LOAD
H001 PIC
Balance or Blackout?
If an industrial facility's internal power plant fails, non-essential systems can be switched off in order to reestablish balance in the network. A new Siemens automatic load-shedding system reacts at lightning speed to prevent any instability in such situations
MAXIMIZING EFFICIENCY
AUTOMATIC LOAD
H001 PIC