Nota de contenido con formato |
CONTENIDO<br/>Borehole stability in Arkoma Basin Air/gas drilling operations / Dittmer, Albert K.<br/>Deep-water strat drilling: California offshore / Driggs, Jack L.<br/>Minimizing costs for drilling shallow infill wells / Grover, Bruce A.<br/>Use of the casing potential profile test for well casing interference studies / Kilpatrick, J. M.; Collings, L. V.<br/>Field test of friction losses in plastic-coated tubing / McLelland, D. R.<br/>A low-viscosity solution for injectivity profile change / McLaughlin, Homer Charles; Jewell, Robert R.; Colomb, Glenn R.<br/>Production data indicate sand incursion alleviated by formation-consolidating plastic / Feaster, John H.; Niehaus, Henry A.<br/>A small coiled-tubing workover rig / Rike, J. L.<br/>A new concept in urban drilling and production / Stelzner, Thomas L.<br/>Modern bottom-hole assemblies for mid-continent drilling / Purswell, G. M.<br/>Some current rock-mechanics research related to oil-well drilling / Gray, K. E.<br/>Petroleum industry applications o new hardmetals / Ortloff, J. E.<br/>Progress report covering the understanding, modifications, and use of the API-AAODC drill-pipe grading system / Reinhold, Walter B.<br/>Measuring and using shale density to aid in drilling wells in high-presssure areas / Boatman, W. A.<br/>A review of modern drilling costs / Peret, Jack<br/>Emerging methods of offshore oil-field development / Field, A. J.; Kunzi, R. E.<br/>Moving drill barges: safely / Gaucher, P. C.<br/>Vacuum deaeration in the northwest witcher waterflood unit / Adams, Gene H.<br/>Tertiary oil recovery: combination water-gas miscible flood: hibberd pool / Chambers, Floyd T.<br/>The use of nuclear explosives in oil and gas production / Coffer, H. F.; Grier, H. E.; Aronson, H. H.<br/>Two years of operation with a hydraulic power-.water system / Crosby, Frederic C.<br/>Deep submersible pumping: sussex tensleep reservoirs / Moore, R. S.<br/>Divers working at 200 feet: six days on: six days off / Stoner, O. E.<br/>Incompatible waters made compatible: a case history / Bass, W. R.; Danielson, R. W.<br/>Distribution of propping agents in vertical fractures / Babcock, R. E.; Prokop, C. L.; Kehle, R. O.<br/>A method for viscous-oil recovery / Felsenthal, M.; Ferrell, H. H.<br/>Pipelining offshore / Bankston, Carl L.; Lee, Griff C.<br/>Effects of variations int he laying system and pipe-wall thickness on the red snapper pipeline / Broussard, D. E.; Barry, D. W.; McCarron, J. C.<br/>Laying large-diameter offshore pipelines / Ward, D. R.<br/>Modern industrial gas turbines for the oil field / Porter, John A.<br/>A new sand-control technique for old sand problems / Sparlin, D. D.<br/>Twenty years of progress with TEG dehydration / Worley, Steve<br/>Injection-well skin effects / Stagge, H. M.<br/>Bibliography of 1967 division of production papers |