Drilling and production practice 1967 /

Drilling and production practice 1967 / American Petroleum Institute. - New York: 1968 - 273 p.

CONTENIDO
Borehole stability in Arkoma Basin Air/gas drilling operations / Dittmer, Albert K.
Deep-water strat drilling: California offshore / Driggs, Jack L.
Minimizing costs for drilling shallow infill wells / Grover, Bruce A.
Use of the casing potential profile test for well casing interference studies / Kilpatrick, J. M.; Collings, L. V.
Field test of friction losses in plastic-coated tubing / McLelland, D. R.
A low-viscosity solution for injectivity profile change / McLaughlin, Homer Charles; Jewell, Robert R.; Colomb, Glenn R.
Production data indicate sand incursion alleviated by formation-consolidating plastic / Feaster, John H.; Niehaus, Henry A.
A small coiled-tubing workover rig / Rike, J. L.
A new concept in urban drilling and production / Stelzner, Thomas L.
Modern bottom-hole assemblies for mid-continent drilling / Purswell, G. M.
Some current rock-mechanics research related to oil-well drilling / Gray, K. E.
Petroleum industry applications o new hardmetals / Ortloff, J. E.
Progress report covering the understanding, modifications, and use of the API-AAODC drill-pipe grading system / Reinhold, Walter B.
Measuring and using shale density to aid in drilling wells in high-presssure areas / Boatman, W. A.
A review of modern drilling costs / Peret, Jack
Emerging methods of offshore oil-field development / Field, A. J.; Kunzi, R. E.
Moving drill barges: safely / Gaucher, P. C.
Vacuum deaeration in the northwest witcher waterflood unit / Adams, Gene H.
Tertiary oil recovery: combination water-gas miscible flood: hibberd pool / Chambers, Floyd T.
The use of nuclear explosives in oil and gas production / Coffer, H. F.; Grier, H. E.; Aronson, H. H.
Two years of operation with a hydraulic power-.water system / Crosby, Frederic C.
Deep submersible pumping: sussex tensleep reservoirs / Moore, R. S.
Divers working at 200 feet: six days on: six days off / Stoner, O. E.
Incompatible waters made compatible: a case history / Bass, W. R.; Danielson, R. W.
Distribution of propping agents in vertical fractures / Babcock, R. E.; Prokop, C. L.; Kehle, R. O.
A method for viscous-oil recovery / Felsenthal, M.; Ferrell, H. H.
Pipelining offshore / Bankston, Carl L.; Lee, Griff C.
Effects of variations int he laying system and pipe-wall thickness on the red snapper pipeline / Broussard, D. E.; Barry, D. W.; McCarron, J. C.
Laying large-diameter offshore pipelines / Ward, D. R.
Modern industrial gas turbines for the oil field / Porter, John A.
A new sand-control technique for old sand problems / Sparlin, D. D.
Twenty years of progress with TEG dehydration / Worley, Steve
Injection-well skin effects / Stagge, H. M.
Bibliography of 1967 division of production papers

622.323 AM35 1967