000 01680nab a22002177 4500
999 _c44049
_d44049
001 H620.91 DEW
003 AR-sfUTN
008 190909b xx |||p|r|||| 00| 0 spa d
040 _cAR-sfUTN
_aAR-SfUTN
080 _aH620.91 DEW
_22000
100 1 _aMönnich, K.
_920615
245 1 0 _aFrom prognosis to reality :
_babout the accuracy of energy yield assessments
336 _2rdacontent
_atexto
_btxt
337 _2rdamedia
_asin mediación
_bn
338 _2rdacarrier
_avolumen
_bnc
505 _aThe accuracy of pre-finance energy yield assessments (EYA) and the uncertainties connected with them is of special importance for developers, operators and investors of wind farms, as these form the basis of financing and economic decisions. In Germany, it is as well the basis for the determination of the site quality ("Standortgüte") and correction factor according the renewable energy sources act EEG 2017. For verifying the accuracy of rheir energy yield assessments, UL DEWI performed a backcast study for 235 wind farms globally between 1997 and 2015. This investigation covers the "German" method for wind farms located in Germany, for which energy assessments mainly base on reference energy yields of neighboring wind farms, and international projects, mainly in France, which base on on-site wind measurements. Several aspects that affect the comparison are discussed and several dependencies identified. Within specific case studies, possible reasons for deviations are explained.
650 _aENERGY EFFICIENCY
773 _tDewi Magazin
_wH620.91 DEW
_nS.T.:H620.91 DEW PP4262
_g(nro. 50, Mar. 2017), p. 6-11
942 _cAN
_2udc