000 | 00889nab a22002297 4500 | ||
---|---|---|---|
001 | H001 PIC | ||
003 | AR-sfUTN | ||
008 | 190909b xx |||p|r|||| 00| 0 spa d | ||
040 | _cAR-sfUTN | ||
080 | _aH001 PIC | ||
100 | _aMuller, Bernd | ||
245 | _aBalance or Blackout? | ||
336 |
_2rdacontent _atexto _btxt |
||
337 |
_2rdamedia _asin mediaciĆ³n _bn |
||
338 |
_2rdacarrier _avolumen _bnc |
||
505 | _aIf an industrial facility's internal power plant fails, non-essential systems can be switched off in order to reestablish balance in the network. A new Siemens automatic load-shedding system reacts at lightning speed to prevent any instability in such situations | ||
650 | _aMAXIMIZING EFFICIENCY | ||
650 | _aAUTOMATIC LOAD | ||
773 |
_tPictures of the future _wH001 PIC _nS.T.:H001 PIC PP3726 _g(nro. , Spring 2013), p. 54-55 |
||
942 | _cAN | ||
999 |
_c39478 _d39478 |