000 | 01068nab a22002297 4500 | ||
---|---|---|---|
001 | H620.91 DEW | ||
003 | AR-sfUTN | ||
008 | 190909b xx |||p|r|||| 00| 0 spa d | ||
040 | _cAR-sfUTN | ||
080 | _aH620.91 DEW | ||
100 | _aBosse, D. [and other] | ||
245 | _aAnalysis and application of hardware in the loop wind loads for full scale nacelle ground testing (GB) | ||
336 |
_2rdacontent _atexto _btxt |
||
337 |
_2rdamedia _asin mediaciĆ³n _bn |
||
338 |
_2rdacarrier _avolumen _bnc |
||
505 | _aThe advancement in wind energy is a main aspect of the German Energiewende, the switch from conventional power production to renewable energy sources. With Wind as the energy source with the highest potential wordwide one challenge in this process is the improvement of the reliability and availability of wind turbine generators (WTG). | ||
650 | _aLOOP WIND LOADS | ||
650 | _aFULL SCALE NACELLE GROUND TESTING | ||
773 |
_tDewi Magazin _wH620.91 DEW _nS.T.:H620.91 DEW PP3706 _g(nro. 43, Ago. 2013), p. 65-70 |
||
942 | _cAN | ||
999 |
_c39022 _d39022 |