000 01322nab a22002657 4500
001 H621 BRO
003 AR-sfUTN
008 190909b xx |||p|r|||| 00| 0 spa d
040 _cAR-sfUTN
080 _aH621 BRO
100 _aSomm, E. [and other]
245 _aLarge steam turbosets
336 _2rdacontent
_atexto
_btxt
337 _2rdamedia
_asin mediaciĆ³n
_bn
338 _2rdacarrier
_avolumen
_bnc
505 _aDesign and operation of the peak and base-load power plant at Karlshamn in Sweden / S. Soderberg, K. Nielsen.- Extension of overspeed test facilities at the BBC works in Birr / A. Fehr, A. Walser.- Running test on a large four-pole generator for the Tennessee Valley Authority / J. Grunenwald, E. Hugentobler.- Experience with the liquid-cooled generator Skaerbaek III / J. Grunenwald.- The new production shop for large steam turboset / L. Leingruber.- Economic aspects of the combined generation / G. Oplatka.- Critical mass flux density in two-phase flow / L. S. Dzung, G. Gyarmathy
650 _aSTEAM TURBOSETS
650 _aPOWER PLANT
650 _aLIQUID-COOLED GENERATOR
650 _aCOMBINED GENERATION
650 _aTWO-PHASE FLOW
773 _tBrown Boveri Review
_wH621 BRO
_nS.T.:H621 BRO PP2796
_g(vol. 65, nro. 1, Jan. 1978), p. 5-61
942 _cAN
999 _c36147
_d36147