000 01090nab a22002537 4500
001 H624.04 STR
003 AR-sfUTN
008 190909b xx |||p|r|||| 00| 0 spa d
040 _cAR-sfUTN
080 _aH624.04 STR
100 _aOrme, D. H.
700 _aThorburn, Samuel
245 _aSystem-built flats on a deep buried quarry
336 _2rdacontent
_atexto
_btxt
337 _2rdamedia
_asin mediaciĆ³n
_bn
338 _2rdacarrier
_avolumen
_bnc
505 _aMr. J. Peacock: 'Mr. Thorburn said that the use of the Armco liner in the piles stopped ground water from getting into the bore; but it could still fill up the bottom of the bore, as far as I could see, so really what does the Armco liner do? It seems quite expensive to put there, and I do not see how it stops water from getting into the bottom of the bore.
650 _aDISCUSSION
650 _aSYSTEM-BUILT FLATS
650 _aDEEP BURIED QUARRY
773 _tThe structural engineer
_wH624.04 STR
_nS.T.:H624.04 STR PP2479
_g(vol. 48, nro. 7, Jul. 1970), p. 261-270
942 _cAN
999 _c34768
_d34768