000 01565nab a22002897 4500
001 H620.91 DEW
003 AR-sfUTN
008 190909b xx |||p|r|||| 00| 0 spa d
040 _cAR-sfUTN
080 _aH620.91 DEW
100 _aSantjer, Fritz
245 _aPower Quality Measurement and Wind Turbine Operating Improvement at the CEMIG Morro do Camelinho Wind Farm in Brazil
336 _2rdacontent
_atexto
_btxt
337 _2rdamedia
_asin mediación
_bn
338 _2rdacarrier
_avolumen
_bnc
505 _aThe Brazilian utility Companhia Energética de Minas Gerais (CEMIG) is owner of a wind farm, consisting of 4 stall controlled wind turbines (WTs) with direct coupled asynchronous generators. The wind farm was installed in 1994. Statistics of the last years show a not sufficient performance in energy yield and operation of the wind farm. This undesired operational performance leads to a loss in energy yield and also leads to additional structural loads which can diminish the life time considerably. DEWI's measurements at this wind farm in autumn 1997 gave explanations for the insufficient performance and led to improvements of the operation of the wind farm.
650 _aWIND ENERGY
650 _aBRAZIL-WIND ENERGY
650 _aPOWER QUALITY MEASUREMENT
650 _aWIND TURBINE
650 _aCOMPANHIA ENERGETICA DE MINAS GERAIS
650 _aWIND FARM
650 _aWIND TURBINES
773 _tDewi Magazin
_wH620.91 DEW
_nS.T.:H620.91 DEW PP0367
_g(nro. 12, Feb. 1998), p. 45-49
942 _cAN
999 _c22525
_d22525