Large steam turbosets

Por: Analíticas: Mostrar analíticasTipo de contenido:
  • texto
Tipo de medio:
  • sin mediación
Tipo de soporte:
  • volumen
Tema(s):
Contenidos:
The availability of large BBC turbosets / E. Somm, K. Reinhard.- Measures to ensure high availability of steam turbines and to facilitate their maintenance / A. Hohm.- Methods for achieving high availability and for simplifying maintenance in turbogenerators / J. Grunenwald.- Safety requirements for steam turbines in nuclear power plants / H. Muhlhauser.- A simple method of estimating impact probabilities or turbine missiles / H. Niessener.- Fast valving / M. Canay, H. Bloch.- Prediction of the operating behaviour of long las-stage3 turbine blades on the basis of laws of similarity / K. Brandstatter, A. Roeder.- Acceptance test on the kriel 1 and 2 units / E. Muller.- 1160 MW turboset for Donald C. Cook nuclear power plant of AEP now in service / F. Vest, F. Schiesser.-
En: Brown Boveri Review (vol. 66, nro. 6, Jun. 1979), p. 365-425S.T.:H621 BRO PP2813
Valoración
    Valoración media: 0.0 (0 votos)
No hay ítems correspondientes a este registro

The availability of large BBC turbosets / E. Somm, K. Reinhard.- Measures to ensure high availability of steam turbines and to facilitate their maintenance / A. Hohm.- Methods for achieving high availability and for simplifying maintenance in turbogenerators / J. Grunenwald.- Safety requirements for steam turbines in nuclear power plants / H. Muhlhauser.- A simple method of estimating impact probabilities or turbine missiles / H. Niessener.- Fast valving / M. Canay, H. Bloch.- Prediction of the operating behaviour of long las-stage3 turbine blades on the basis of laws of similarity / K. Brandstatter, A. Roeder.- Acceptance test on the kriel 1 and 2 units / E. Muller.- 1160 MW turboset for Donald C. Cook nuclear power plant of AEP now in service / F. Vest, F. Schiesser.-

No hay comentarios en este titulo.

para colocar un comentario.