Re-financing of Operating Wind Farms : A Case Study in Northern France

Por: Colaborador(es): Analíticas: Mostrar analíticasTipo de contenido:
  • texto
Tipo de medio:
  • sin mediación
Tipo de soporte:
  • volumen
Tema(s):
Contenidos:
This paper shows the impact on the wind farm financing scheme of an energy yield assessment based on wind farm production data. Initially, this scheme relied on an energy yield assessment based on a wind measurement campaign of medium quality. After one year of operation, the financing scheme has been updated according to a combined analysis of an additional high quality measurement campaign and of the wind farm operational data. A long-term correlation method of the production data is conducted using a site-specific energy index. With this combined approach, the uncertainty analysis yields to a p90 increase of about 15 p.c.
En: Dewi Magazin (nro. 32, Feb. 2008), p. 70-78S.T.:H620.91 DEW PP0383
Valoración
    Valoración media: 0.0 (0 votos)
No hay ítems correspondientes a este registro

This paper shows the impact on the wind farm financing scheme of an energy yield assessment based on wind farm production data. Initially, this scheme relied on an energy yield assessment based on a wind measurement campaign of medium quality. After one year of operation, the financing scheme has been updated according to a combined analysis of an additional high quality measurement campaign and of the wind farm operational data. A long-term correlation method of the production data is conducted using a site-specific energy index. With this combined approach, the uncertainty analysis yields to a p90 increase of about 15 p.c.

No hay comentarios en este titulo.

para colocar un comentario.