Estimation of the grid connection requirements for offshore wind farms in the North Sea
Analíticas: Mostrar analíticasTipo de contenido:- texto
- sin mediación
- volumen
Contenidos:
En: Dewi Magazin (nro. 32, Feb. 2008), p. 47-55S.T.:H620.91 DEW PP0383
The object of the study was to give an estimation as realistic as possible of the time scale and distribution of the grid connections required for OWF in the E.ON Netz control area on the basis of a rating system developed for the purpose.
No hay ítems correspondientes a este registro
The object of the study was to give an estimation as realistic as possible of the time scale and distribution of the grid connections required for OWF in the E.ON Netz control area on the basis of a rating system developed for the purpose.
No hay comentarios en este titulo.
Ingresar a su cuenta para colocar un comentario.